209

Flowing Tree

Located in Near Judicial Layout, Bellary Road

Premium 2 & 3 BHK apartments with areas ranging from 1556-2688 sq. ft, overlooking the scenic Allalasandra lake near Judicial layout, off Bellary road.

Reimagine
Life

Imagine waking up to the sight of swans swimming across a lake on one side. On the other side, you see an endless forest that goes on into the horizon.

Virtual Tour
img
img
  • img
    img
    INTERIOR
  • img
    img
    EXTERIOR
  • img
    img
    WALK THROUGH

Project at a Glance

img
  • 142 Apartments 142 Apartments
  • Built on 2.2 acres Built on 2.2 acres
  • GKVK forest closeby GKVK forest closeby
  • G+ 15 Floors G+ 15 Floors
  • Overlooking the scenic Allalasandra lake Overlooking the scenic Allalasandra lake

These future-ready homes are equipped with smart home features with world-class amenities and are in close proximity to some of North Bangalore’s best infrastructures.

img

These future-ready homes are equipped with smart home features with world-class amenities and are in close proximity to some of North Bangalore’s best infrastructures.

  • 142 Apartments 142 Apartments
  • Built on 2.2 acres Built on 2.2 acres
  • GKVK forest closeby GKVK forest closeby
  • G+ 15 Floors G+ 15 Floors
  • Overlooking the scenic Allalasandra lake Overlooking the scenic Allalasandra lake

with 80% open space
it is the best project
in north Bangalore

With 142 units, 15 floors, built on 2.2 acres, the Flowing Tree is a single tower project, flaunting 80% open space- that is best suitable for the current day scenario of social distancing.

80% open space

80% open space

Urban Serenity

Urban Serenity

Ready for the New normal

Ready for the New normal

Future-Ready Homes

Future-Ready Homes

Master plan

Get familiar with the world-class feature rich Master Plan of your future home designed by Capstone Life. We provide you with the contemporary Avant-garde designs and aim to build communities.

Entry and Exit for the Flowing Tree with Security Gate and RFID security System.

A 9.0m wide driveway finished with high quality pavers.

3.5m wide Entry for the Upper basement.

Services like Transformer, DG etc.

Surface level Car Parking space for the visitors.

3.5m wide Exit from the Upper basement.

Drop off area for the Apartment Block/ Club House.

Space for the Services like Gas Bank and OWC.

Security Cabin for the security staff and Waiting Lounge for the visitors.

Open area theatre with stepped seating for outdoor entertainment.

Play area for Children with sand pit and Play equipment.

Multi sports area for outdoor activities
img

Total Land Area - 2.20 Acres (8905.56 SQM)

Single tower - 2B+Ground+15 upper floors

2BHK Starts from 1324.00 Sq.ft
3BHK Starts from 1556.00 Sq.ft

Unit plan

Experience life in the hub of Bangalore with close proximity to important infrastructures yet amidst nature, overlooking the scenic Allalasandra lake.

  • Saleable Area 1324 sq.ft.
  • RERA Carpet Area 839 sq.ft.
  • RERA Balcony 112 sq.ft.
img
img
  • Saleable Area 1556 sq.ft.
  • RERA Carpet Area 965 sq.ft.
  • RERA Balcony 159 sq.ft.
img
img
  • Saleable Area 1730 sq.ft.
  • RERA Carpet Area 1100 sq.ft.
  • RERA Balcony 140 sq.ft.
img
img
  • Saleable Area 1626 sq.ft.
  • RERA Carpet Area 1025 sq.ft.
  • RERA Balcony 137 sq.ft.
img
img

Technical
specifications

A reflection of thoughtful design, meticulous planning and obsession to quality of workmanship

Location map

Experience life in the hub of Bangalore with close proximity to important infrastructures yet amidst nature, overlooking the scenic Allalasandra lake.

Vidyashilp
10 Min
Mallya Aditi
10 Min
National Public school
5 Min
Delhi public school
20 Min
Canadian International school
20 Min
Stonehill International school
25 Min

Manyata Tech Park
20 Min
Brigade Opus/Magnum
10 Min
RMZ Latitude
14 Min

RMZ Galleria
100 Min
Royal orchid resort
3 Min
Garuda Central
10 Min

Columbia Asia
10 Min
Aster CMI
20 Min
Baptist Hospital
25 Min
img

Projects approved by below
Financial institutions

img img img img img

Construction at
Flowing Tree
is close to completion

  • imgStructure 100% Completed
  • imgInternal Plastering 100% Completed
  • imgWaterproofing 100% Completed
  • imgExternal Plastering 100% Completed
  • imgFlooring 100% Completed
  • imgDoors Fixing 90% Completed
  • imgPainting 60% Completed
  • imgClub House 50% Completed
  • imgExternal Development Works 60% Completed